Heavy Duty workover rigs

Categories: ,

Description

Heavy-duty Onshore Workover Rigs five types : XJ450、XJ550、XJ650、XJ750、XJ1000.

 

Parameter

Model

XJ450

XJ550

XJ650

XJ750

XJ1000

Workover depth (4-1/2”DP) : m (ft)

3500(11483)

4000(13123)

5500(18045)

6500(21325)

7500(24606)

The max. hook load: KN (lb)

1125(253000)

1350(303696)

1470(330700)

1700(381260)

2250(505800)

The drilling line dia: mm(in)/number

¢26(1”)/8

¢26(1”)/8

¢29(1-1/8”)/8

¢29(1-1/8”)/10

¢32(1-1/4”)/10

The Max.hook lifting speed m/s(ft/s)

1.23(4)

1.33(4.36)

1.31(4.3)

1.36(4.46)

1.36(4.46)

The Max.hook lifting speed  m (ft)

17.6×2.9×4.25 (17.6×2.9×4.25)

19.6×2.9×4.25 (64.3×9.5×13.8)

20.13×3.2×4.4 (66×10.5×14.44)

21.25×3.3×4.47 (69.7×10.8×14.67)

22.45×3.3×4.48 (73.65×10.8×14.7)

Weight: kg(lb)

42000(92590)

51000(112430)

56000(123456)

76000(167548)

82000(180776)

Power system

CAT C15

CAT C15

CAT C18

CAT C15×2

CAT C18×2

Engine power: KW(hp)(2100r/min)

475

540

650

540×2

630×2

Hydraulic transmission type

ALLISON-S5600DB

ALLISON-5610HR

ALLISON-S6610HR

ALLISON-S5600×2

ALLISON-S6610×2

Emergency power

select

select

select

——

——

The chassis driving type

10×8(8×8)

10×8

12×8

14×8

14×8

The chassis driving type

34(111.55)

34(111.55)

36(118.11)

42(137.8)

44(144)

The min. clearance from ground: mm(in)

340(13.39)

340(13.39)

340(13.39)

340(13.39)

340(13.39)

Drawworks type

Double drum

Double drum

Double drum

Double drum

Double drum

Rate power of drawworks: hp

450

550

650

750

1000

Diameter of main drum:mm(in)

¢429×965 (¢16.9×38)

¢429×965 (¢16.9×38)

¢480×914.5 (¢18.9×36)

¢528×1012 (¢20.8×39.8)

¢635×1254 (¢25×49.4)

The main drum brake type

Band type

Band type

Band type

Band type

Band type

The main drum auxiliary type

WCB224

WCB224

WCB224

WCB224

WCB236

Drawworks lifting shifts

5 forward 1 reverse

5 forward 1 reverse

5 forward 1 reverse

5 forward 1 reverse

5 forward 1 reverse

The mast type (double sections telescoping)

JJ119/32

JJ135/34

JJ155/34

JJ170/38

JJ225/38

The mast  height:m(ft)

32(105)

34(111.55)

34(111.55)

38(124.6)

38(124.6)

Racking platform height: m(ft)

19.7/20.7(55.77/64.6)

20/21.5(65.62/70.54)

20/21.5(65.6/70.54)

20.4(66.9)

20.4(66.9)

Max.wind load:km/h(kn)

110(60)

110(60)

110(59.35)

110(60)

110(60)

Control/lights/power circuit

24V/220V/380V(China)

24V/220V/380V(China)

24V/220V/380V(China)

24V/220V/380V(China)

24V/220V/380V(China)

Rated pressure of hydraulic/ air:MPa(psi)

14/0.833-0.93(2002/ 119.12-133)

14/0.833-0.93(2002/ 119.119-132.99)

14/0.833-0.93(2002/ 119.12-133)

14/0.833-0.93(2002/119.12-133)

14/0.833-0.93(2002/119.12-133)

Drilling platform

ZT135/3.7-Stelescoping type

ZT135/4.5-Stelescoping type

ZT147/4.5-Zscoped type

ZT180/6-Zscoped type

ZT225/6-Zscoped type

Rotary table

ZP175

ZP175

ZP175

ZP205/ZP275

ZP275

Traveling block/hook

YG150

YG150

YG150

YG180

YG225

Swivel

SL120

SL135

SL160

SL225

SL225

Reviews

There are no reviews yet.

Be the first to review “Heavy Duty workover rigs”